Comparison between ITIL V3 and ITIL V2 - The Main Changes: Difference between revisions

From IT Process Wiki
(Addition of link to the comparison between ITIL 4 and ITIL V3 2011 in the YaSM Wiki.)
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
<seo metakeywords="itil v3 vs v2, difference between itil v2 and v3, itil v3 vs v2, itil v3 processes" metadescription="ITIL v3 vs. ITIL V2 - Comparison and Changes. Contents. 1 Comparison and Changes between ITIL V3 and ITIL V2 in General. 1.1 New ITIL Structure: ..." />
<itpmch><title>Comparison between ITIL V3 and ITIL V2 - The Main Changes | IT Process Wiki</title>
<meta name="keywords" content="itil v3 vs v2, difference between itil v2 and v3, itil v3 vs v2, itil v3 processes" />
<meta name="description" content="ITIL v3 vs. ITIL V2 - Comparison and Changes. Contents. 1 Comparison and Changes between ITIL V3 and ITIL V2 in General. 1.1 New ITIL Structure: ..." />
</itpmch>
<imagemap>
<imagemap>
Image:ITIL-Wiki-de-es.jpg|DE - ES - ITIL v3 vs. ITIL V2 - Comparison and Changes|100px
Image:ITIL-Wiki-de-es.jpg|right|DE - ES - ITIL v3 vs. ITIL V2 - Comparison and Changes|163px
rect 0 0 50 30 [https://wiki.de.it-processmaps.com/index.php/Vergleich_von_ITIL_V3_und_ITIL_V2_-_Die_wichtigsten_%C3%84nderungen diese Seite in Deutsch]
rect 81 0 114 36 [https://wiki.de.it-processmaps.com/index.php/Vergleich_von_ITIL_V3_und_ITIL_V2_-_Die_wichtigsten_%C3%84nderungen diese Seite in Deutsch]
rect 50 0 100 30 [https://wiki.es.it-processmaps.com/index.php/Comparaci%C3%B3n_entre_ITIL_V3_e_ITIL_V2 esta página en español]
rect 115 0 163 36 [https://wiki.es.it-processmaps.com/index.php/Comparaci%C3%B3n_entre_ITIL_V3_e_ITIL_V2 esta página en español]
desc none
desc none
</imagemap>
</imagemap>
<p>&nbsp;</p>


== Comparison and Changes between ITIL V3 and ITIL V2 in General ==
==Comparison and Changes between ITIL V3 and ITIL V2 in General==


Most importantly, a detailed comparison between ITIL V3 and V2 reveals that all the main processes known from ITIL V2 are still there, with only few substantial changes. In many instances, however, ITIL V3 offers revised and enhanced process descriptions.
Most importantly, a detailed comparison between ITIL V3 and V2 reveals that all the main processes known from ITIL V2 are still there, with only few substantial changes. In many instances, however, ITIL V3 offers revised and enhanced process descriptions.


==== New ITIL Structure: The ITIL V3 Service Lifecycle ====
<p>&nbsp;</p>
 
==New ITIL Structure: The ITIL V3 Service Lifecycle==


The main difference between ITIL V3 and V2 is the new ITIL V3 Service Lifecycle structure: ITIL V3 is best understood as seeking to implement feedback-loops by arranging processes in a circular way.
The main difference between ITIL V3 and V2 is the new ITIL V3 Service Lifecycle structure: ITIL V3 is best understood as seeking to implement feedback-loops by arranging processes in a circular way.
Line 17: Line 23:
This means the old structure of Service Support and Service Delivery was replaced by a new one consisting of the five ITIL V3 core disciplines:
This means the old structure of Service Support and Service Delivery was replaced by a new one consisting of the five ITIL V3 core disciplines:


* [[ITIL V3 Service Strategy|Service Strategy]] determines which types of services should be offered to which customers or markets
*[[ITIL Service Strategy|Service Strategy]] determines which types of services should be offered to which customers or markets
* [[ITIL V3 Service Design|Service Design]] identifies service requirements and devises new service offerings as well as changes and improvements to existing ones
*[[ITIL Service Design|Service Design]] identifies service requirements and devises new service offerings as well as changes and improvements to existing ones
* [[ITIL V3 Service Transition|Service Transition]] builds and deploys new or modified services
*[[ITIL Service Transition|Service Transition]] builds and deploys new or modified services
* [[ITIL V3 Service Operation|Service Operation]] carries out operational tasks
*[[ITIL Service Operation|Service Operation]] carries out operational tasks
* [[ITIL V3 CSI - Continual Service Improvement|Continual Service Improvement]] learns from past successes and failures and continually improves the effectiveness and efficiency of services and processes.
*[[ITIL CSI - Continual Service Improvement|Continual Service Improvement]] learns from past successes and failures and continually improves the effectiveness and efficiency of services and processes.


ITIL V3 complements the processes known from ITIL V2 with a number of new processes and puts more emphasis on producing value for the business.
ITIL V3 complements the processes known from ITIL V2 with a number of new processes and puts more emphasis on producing value for the business.


==== Modifications to Process Interfaces in ITIL V3 ====
====Modifications to Process Interfaces in ITIL V3====


Due to the new Service Lifecycle structure, all interfaces between the ITIL processes were changed in order to reflect the new ITIL V3 process structure; so even if processes in ITIL V3 and V2 are broadly identical, their interfaces have changed. Example: The Incident Management process must now link to the Service Design processes, although a comparison between Incident Management in ITIL V2 and V3 reveals that the process itself did not change substantially.
Due to the new Service Lifecycle structure, all interfaces between the ITIL processes were changed in order to reflect the new ITIL V3 process structure; so even if processes in ITIL V3 and V2 are broadly identical, their interfaces have changed. Example: The Incident Management process must now link to the Service Design processes, although a comparison between Incident Management in ITIL V2 and V3 reveals that the process itself did not change substantially.
Line 31: Line 37:
<p>&nbsp;</p>
<p>&nbsp;</p>


==== ITIL V3 2011 Edition ====
==Comparison and Changes between ITIL V3 and ITIL V2 in Detail==


&#8594; Details: '''[[ITIL 2011|ITIL 2011 Upgrade]]'''
===[[ITIL Service Strategy|Service Strategy]]===
----


<p>&nbsp;</p>
====[[Service Portfolio Management]]====
*Managing services as a portfolio is a new concept in ITIL V3
*ITIL V3 takes this concept further, introducing strategic thinking about how the Service Portfolio should be developed in the future


== Comparison and Changes between ITIL V3 and ITIL V2 in Detail ==
====[[Financial Management]]====
 
*Essentially, the activities and process objectives of the Financial Management process are identical in ITIL V2 and V3
=== [[ITIL V3 Service Strategy|Service Strategy]] ===
*Financial Management was part of Service Delivery in ITIL V2
 
==== [[Service Portfolio Management]] ====
* Managing services as a portfolio is a new concept in ITIL V3
* ITIL V3 takes this concept further, introducing strategic thinking about how the Service Portfolio should be developed in the future
 
==== [[Financial Management]] ====
* Essentially, the activities and process objectives of the Financial Management process are identical in ITIL V2 and V3
* Financial Management was part of Service Delivery in ITIL V2


<p>&nbsp;</p>
<p>&nbsp;</p>


=== [[ITIL V3 Service Design|Service Design]] ===
===[[ITIL Service Design|Service Design]]===
----


==== [[Service Catalogue Management]] ====
====[[Service Catalogue Management]]====
* Service Catalogue Management was added as a new process in ITIL V3
*Service Catalogue Management was added as a new process in ITIL V3
* In ITIL V2, the Service Level Management process mentioned the concept of a Service Catalogue
*In ITIL V2, the Service Level Management process mentioned the concept of a Service Catalogue
* ITIL V3 takes this concept further, introducing a dedicated process to ensure that the Service Catalogue is up-to-date and contains reliable information
*ITIL V3 takes this concept further, introducing a dedicated process to ensure that the Service Catalogue is up-to-date and contains reliable information
* ITIL V3 introduces a clear distinction in the Service Catalogue between Business Services (services visible to the customer, defined by SLAs), Supporting Services (services visible only inside the IT organization, defined by OLAs or UCs)
*ITIL V3 introduces a clear distinction in the Service Catalogue between Business Services (services visible to the customer, defined by SLAs), Supporting Services (services visible only inside the IT organization, defined by OLAs or UCs)


==== [[Service Level Management]] ====
====[[Service Level Management]]====
* Essentially, the activities and process objectives of the Service Level Management process are identical in ITIL V2 and V3
*Essentially, the activities and process objectives of the Service Level Management process are identical in ITIL V2 and V3
* In ITIL V3, the Service Review activities are part of Continual Service Improvement
*In ITIL V3, the Service Review activities are part of Continual Service Improvement


==== [[Risk Management]] ====
====[[Risk Management]]====
* Risks are addressed within several processes in ITIL V2 and ITIL V3; there is, however, no dedicated Risk Management process
*Risks are addressed within several processes in ITIL V2 and ITIL V3; there is, however, no dedicated Risk Management process
* ITIL V3 calls for “coordinated risk assessment exercises”, so at IT Process Maps we decided to assign clear responsibilities for managing risks, which meant introducing a specific Risk Management process as part of the ITIL&reg; Process Map V3
*ITIL V3 calls for “coordinated risk assessment exercises”, so at IT Process Maps we decided to assign clear responsibilities for managing risks, which meant introducing a specific Risk Management process as part of the ITIL&reg; Process Map V3
* Having a basic Risk Management process in place will provide a good starting point for introducing best-practice Risk Management frameworks like M_o_R (as recommended in the ITIL V3 books)
*Having a basic Risk Management process in place will provide a good starting point for introducing best-practice Risk Management frameworks like M_o_R (as recommended in the ITIL V3 books)


==== [[Capacity Management]] ====
====[[Capacity Management]]====
* No major differences between ITIL V2 and ITIL V3
*No major differences between ITIL V2 and ITIL V3


==== [[Availability Management]] ====
====[[Availability Management]]====
* No major differences between ITIL V2 and ITIL V3
*No major differences between ITIL V2 and ITIL V3


==== [[IT Service Continuity Management]] ====
====[[IT Service Continuity Management]]====
* No major differences between ITIL V2 and ITIL V3
*No major differences between ITIL V2 and ITIL V3


==== [[IT Security Management|Information Security Management]] ====
====[[IT Security Management|Information Security Management]]====
* ITIL V2 provided guidance on Security Management in a separate book
*ITIL V2 provided guidance on Security Management in a separate book
* ITIL V3 treats Information Security Management as part of the Service Design core volume, resulting in a better integration of this process into the Service Lifecycle
*ITIL V3 treats Information Security Management as part of the Service Design core volume, resulting in a better integration of this process into the Service Lifecycle
* The process was updated to account for new security concerns
*The process was updated to account for new security concerns


==== [[Compliance Management]] ====
====[[Compliance Management]]====
* Compliance issues are addressed within several processes in ITIL V2 and ITIL V3; there is, however, no dedicated Compliance Management process
*Compliance issues are addressed within several processes in ITIL V2 and ITIL V3; there is, however, no dedicated Compliance Management process
* Compliance is an increasingly important topic for IT organizations, so at IT Process Maps we decided to assign clear responsibilities for ensuring compliance, which meant introducing a specific Compliance Management process as part of the ITIL&reg; Process Map V3
*Compliance is an increasingly important topic for IT organizations, so at IT Process Maps we decided to assign clear responsibilities for ensuring compliance, which meant introducing a specific Compliance Management process as part of the ITIL&reg; Process Map V3


==== [[IT Architecture Management|Architecture Management]] ====
====[[IT Architecture Management|Architecture Management]]====
* Architecture Management was covered within Application Management in ITIL V2
*Architecture Management was covered within Application Management in ITIL V2
* ITIL V3 provides guidance on IT architecture issues as part of a chapter on "technology-related activities"
*ITIL V3 provides guidance on IT architecture issues as part of a chapter on "technology-related activities"
* Having a well-defined architecture blueprint in place is very important for IT organizations, so at IT Process Maps we decided to assign clear responsibilities for managing the enterprise architecture, which meant introducing a specific Architecture Management process as part of the ITIL&reg; Process Map V3
*Having a well-defined architecture blueprint in place is very important for IT organizations, so at IT Process Maps we decided to assign clear responsibilities for managing the enterprise architecture, which meant introducing a specific Architecture Management process as part of the ITIL&reg; Process Map V3


==== [[Supplier Management]] ====
====[[Supplier Management]]====
* Supplier Management was covered within ICT Infrastructure Management in ITIL V2
*Supplier Management was covered within ICT Infrastructure Management in ITIL V2
* In ITIL V3, Supplier Management is part of the Service Design process to allow for a better integration into the Service Lifecycle
*In ITIL V3, Supplier Management is part of the Service Design process to allow for a better integration into the Service Lifecycle


<p>&nbsp;</p>
<p>&nbsp;</p>


=== [[ITIL V3 Service Transition|Service Transition]] ===
===[[ITIL Service Transition|Service Transition]]===
----


==== [[Change Management]] ====
====[[Change Management]]====
* Essentially, the activities and process objectives of the Change Management process are identical in ITIL V2 and V3
*Essentially, the activities and process objectives of the Change Management process are identical in ITIL V2 and V3
* ITIL V3 introduces "Change Models", putting more emphasis on defining different types of Changes and how they are to be handled
*ITIL V3 introduces "Change Models", putting more emphasis on defining different types of Changes and how they are to be handled
* Emergency Changes in ITIL V3 are authorized by the Emergency Change Advisory Board (ECAB), which was known as the Emergency Committee (EC) in ITIL V2
*Emergency Changes in ITIL V3 are authorized by the Emergency Change Advisory Board (ECAB), which was known as the Emergency Committee (EC) in ITIL V2


====[[Project Management - Transition Planning and Support|Project Management (Transition Planning and Support)]]====
====[[Project Management - Transition Planning and Support|Project Management (Transition Planning and Support)]]====
* Transition Planning and Support is a new process in ITIL V3; ITIL V2 covered some aspects of this process within Release Management but ITIL V3 provides considerably enhanced guidance
*Transition Planning and Support is a new process in ITIL V3; ITIL V2 covered some aspects of this process within Release Management but ITIL V3 provides considerably enhanced guidance
* Transition Planning and Support in ITIL V3 is actually about managing service transition projects, so at IT Process Maps we decided to make this clear by slightly changing its name to "Project Management (Transition Planning and Support)"
*Transition Planning and Support in ITIL V3 is actually about managing service transition projects, so at IT Process Maps we decided to make this clear by slightly changing its name to "Project Management (Transition Planning and Support)"
* ITIL V3 does not provide a detailed explanation of all aspects of Project Management but highlights the most important activities and assists in identifying interfaces with the other Service Management processes. However, having a basic Project Management process defined will provide a good starting point for introducing best-practice Project Management frameworks like PRINCE2 or PMBOK (as recommended in the ITIL V3 books)  
*ITIL V3 does not provide a detailed explanation of all aspects of Project Management but highlights the most important activities and assists in identifying interfaces with the other Service Management processes. However, having a basic Project Management process defined will provide a good starting point for introducing best-practice Project Management frameworks like PRINCE2 or PMBOK (as recommended in the ITIL V3 books)  


==== [[Release and Deployment Management]] ====
====[[Release and Deployment Management]]====
* Essentially, the activities and process objectives of the Release and Deployment Management process in ITIL V3 are identical to Release Management in ITIL V2
* Essentially, the activities and process objectives of the Release and Deployment Management process in ITIL V3 are identical to Release Management in ITIL V2
* ITIL V3 provides considerably more details in the areas of Release planning and testing; this led to the addition of two dedicated processes in ITIL V3 which were subsumed under Release Management in the previous ITIL version:
*ITIL V3 provides considerably more details in the areas of Release planning and testing; this led to the addition of two dedicated processes in ITIL V3 which were subsumed under Release Management in the previous ITIL version:
** Project Management (Transition Planning and Support)
**Project Management (Transition Planning and Support)
** Service Validation and Testing
**Service Validation and Testing


==== [[Service Validation and Testing]] ====
====[[Service Validation and Testing]]====
* Service Validation and Testing is new process in ITIL V3; ITIL V2 covered some aspects of Release testing within Release Management but ITIL V3 provides considerably enhanced guidance
* Service Validation and Testing is new process in ITIL V3; ITIL V2 covered some aspects of Release testing within Release Management but ITIL V3 provides considerably enhanced guidance
* Major additions in ITIL V3 are details on the various testing stages during Service Transition and descriptions of the corresponding testing approaches
*Major additions in ITIL V3 are details on the various testing stages during Service Transition and descriptions of the corresponding testing approaches


==== [[Application Development and Customization]] ====
====[[Application Development and Customization]]====
* Application Development is barely mentioned in the ITIL V3 books, as ITIL V3 focuses on different topics like service design and rollout
*Application Development is barely mentioned in the ITIL V3 books, as ITIL V3 focuses on different topics like service design and rollout
* At IT Process Maps we decided to eliminate that gap by introducing an Application Development process which takes care of the actual application coding and the customization of standard software packages
*At IT Process Maps we decided to eliminate that gap by introducing an Application Development process which takes care of the actual application coding and the customization of standard software packages
* Even if Application Development is generally regarded a field of its own, we think an Application Management process must be included in any ITIL V3 process structure to make sure that there are clearly defined interfaces between the design, development and rollout stages of a service  
*Even if Application Development is generally regarded a field of its own, we think an Application Management process must be included in any ITIL V3 process structure to make sure that there are clearly defined interfaces between the design, development and rollout stages of a service  


==== [[Service Asset and Configuration Management]] ====
====[[Service Asset and Configuration Management]]====
* Activities and process objectives of the Service Asset and Configuration Management process are broadly identical in ITIL V3 and V2.  
*Activities and process objectives of the Service Asset and Configuration Management process are broadly identical in ITIL V3 and V2.  
* ITIL V3 introduces the "[[Service Asset and Configuration Management#CMS CMDB|Configuration Management System (CMS)]]" as a logical data model, encompassing several [[Service Asset and Configuration Management#CMS CMDB|Configuration Management Databases (CMDB)]].
*ITIL V3 introduces the "[[Service Asset and Configuration Management#CMS CMDB|Configuration Management System (CMS)]]" as a logical data model, encompassing several [[Service Asset and Configuration Management#CMS CMDB|Configuration Management Databases (CMDB)]].


==== [[Knowledge Management]] ====
====[[Knowledge Management]]====
* Knowledge Management was added as a new process in ITIL V3
*Knowledge Management was added as a new process in ITIL V3
* Many aspects of Knowledge Management were covered by various processes in ITIL V2 - for example, Problem Management was (and in ITIL V3 still is) responsible for managing the Known Error Database
*Many aspects of Knowledge Management were covered by various processes in ITIL V2 - for example, Problem Management was (and in ITIL V3 still is) responsible for managing the Known Error Database
*ITIL V3, however, defines Knowledge Management as the one central process responsible for providing knowledge to all other IT Service Management processes
*ITIL V3, however, defines Knowledge Management as the one central process responsible for providing knowledge to all other IT Service Management processes


<p>&nbsp;</p>
<p>&nbsp;</p>


===[[ITIL V3 Service Operation|Service Operation]] ===
===[[ITIL Service Operation|Service Operation]]===
----


==== [[Event Management]] ====
====[[Event Management]]====
* Event Management was part of ICT Infrastructure Management in ITIL V2
*Event Management was part of ICT Infrastructure Management in ITIL V2
* Activities and process objectives of the Event Management process are broadly identical in ITIL V2 and V3
*Activities and process objectives of the Event Management process are broadly identical in ITIL V2 and V3
* ITIL V3 sees Event Management as an important trigger of the Incident and Problem Management processes
*ITIL V3 sees Event Management as an important trigger of the Incident and Problem Management processes


==== [[Incident Management]] ====
====[[Incident Management]]====
* Essentially, the activities and process objectives of the Incident Management process are identical in ITIL V2 and V3
*Essentially, the activities and process objectives of the Incident Management process are identical in ITIL V2 and V3
* ITIL V3 distinguishes between Incidents (Service Interruptions) and Service Requests (standard requests from users, e.g. password resets)
*ITIL V3 distinguishes between Incidents (Service Interruptions) and Service Requests (standard requests from users, e.g. password resets)
* Service Requests are no longer fulfilled by Incident Management; instead there is a new process called Request Fulfilment
*Service Requests are no longer fulfilled by Incident Management; instead there is a new process called Request Fulfilment
* There is a dedicated process now for dealing with emergencies ("Major Incidents")
*There is a dedicated process now for dealing with emergencies ("Major Incidents")
* A process interface was added between Event Management and Incident Management. Significant Events are now triggering the creation of an Incident
*A process interface was added between Event Management and Incident Management. Significant Events are now triggering the creation of an Incident


==== [[Request Fulfilment]] ====
====[[Request Fulfilment]]====
* Request Fulfilment was added as a new process to ITIL V3 with the aim to have a dedicated process dealing with Service Requests
*Request Fulfilment was added as a new process to ITIL V3 with the aim to have a dedicated process dealing with Service Requests
* This was motivated by a clear distinction in ITIL V3 between Incidents (Service Interruptions) and Service Requests (standard requests from users, e.g. password resets)
*This was motivated by a clear distinction in ITIL V3 between Incidents (Service Interruptions) and Service Requests (standard requests from users, e.g. password resets)
* In ITIL V2, Service Requests were fulfilled by the Incident Management process
*In ITIL V2, Service Requests were fulfilled by the Incident Management process


==== [[Access Management]] ====
====[[Access Management]]====
* Access Management was added as a new process to ITIL V3
*Access Management was added as a new process to ITIL V3
* The decision to include this dedicated process was motivated by IT security reasons, as granting access to IT services and applications only to authorized users is of high importance from an IT Security viewpoint
*The decision to include this dedicated process was motivated by IT security reasons, as granting access to IT services and applications only to authorized users is of high importance from an IT Security viewpoint


==== [[Problem Management]] ====
====[[Problem Management]]====
* Essentially, the activities and process objectives of the Problem Management process are identical in ITIL V2 and ITIL V3
*Essentially, the activities and process objectives of the Problem Management process are identical in ITIL V2 and ITIL V3
* A new sub-process "Major Problem Review" was introduced to review the solution history of major Problems in order to prevent a recurrence and learn lessons for the future
*A new sub-process "Major Problem Review" was introduced to review the solution history of major Problems in order to prevent a recurrence and learn lessons for the future


==== [[IT Operations Management]] ====
====[[IT Operations Management]]====
* IT Operations Management is part of ICT Infrastructure Management in ITIL V2
*IT Operations Management is part of ICT Infrastructure Management in ITIL V2
* Some operational aspects were described in more detail in ITIL V2 as in the new ITIL V3 books
*Some operational aspects were described in more detail in ITIL V2 as in the new ITIL V3 books


==== [[IT Facilities Management|Facilities Management]] ====
====[[IT Facilities Management|Facilities Management]]====
* Facilities Management is part of ICT Infrastructure Management in ITIL V2
*Facilities Management is part of ICT Infrastructure Management in ITIL V2
* Some aspects of managing facilities were described in more detail in ITIL V2 as in the new ITIL V3 books
*Some aspects of managing facilities were described in more detail in ITIL V2 as in the new ITIL V3 books


<p>&nbsp;</p>
<p>&nbsp;</p>


=== [[ITIL V3 CSI - Continual Service Improvement|Continual Service Improvement]] ===
===[[ITIL CSI - Continual Service Improvement|Continual Service Improvement]]===
* ITIL V2 contained some Continual Service Improvement activities within the [[Service Level Management - ITIL V2|Service Level Management]] process, for example holding Service Reviews and managing a Service Improvement Plan
----
* ITIL V3 expands this into a whole new book, introducing dedicated processes for service and process evaluation and improvement.
 
*ITIL V2 contained some Continual Service Improvement activities within the [[Service Level Management - ITIL V2|Service Level Management]] process, for example holding Service Reviews and managing a Service Improvement Plan
*ITIL V3 expands this into a whole new book, introducing dedicated processes for service and process evaluation and improvement.
 
<p>&nbsp;</p>
 
====ITIL V3 2011 Edition====
 
*Comparison and Changes between ITIL V3 (2007) and ITIL 2011: &#8594; Details: '''[[ITIL 2011|ITIL 2011 Upgrade]]'''
*Detailed ITIL Process Descriptions: &#8594; '''[[ITIL Processes|ITIL 2011 Processes]]'''
 
<html><i>Note</i>: The <a href="/index.php/ITIL_4" title="ITIL 4">new edition of ITIL 4</a> was published in February 2019. In our YaSM Service Management Wiki we provide a detailed <b><a class="external text" href="https://yasm.com/wiki/en/index.php/ITIL_4_vs_ITIL_V3" title="Changes in detail: ITIL 4 vs ITIL 2011">comparison between the latest edition of ITIL 4 and ITIL V3 2011</a></b>.</html>
 
<p>&nbsp;</p>
 
==[ Infobox ]==
 
<html><table class="wikitable">
<tr>
<td>Link to this page:</td>
<td><a itemprop="url" href="https://wiki.en.it-processmaps.com/index.php/Comparison_between_ITIL_V3_and_ITIL_V2_-_The_Main_Changes">https://wiki.en.it-processmaps.com/index.php/Comparison_between_ITIL_V3_and_ITIL_V2_-_The_Main_Changes</a></td>
</tr>
<tr>
<td>Languages:</td>
<td><span itemprop="inLanguage" content="en">English</span> | <span><a itemprop="citation" class="external text" href="https://wiki.de.it-processmaps.com/index.php/Vergleich_von_ITIL_V3_und_ITIL_V2_-_Die_wichtigsten_%C3%84nderungen">Deutsch</a></span> | <span><a itemprop="citation" class="external text" href="https://wiki.es.it-processmaps.com/index.php/Comparaci%C3%B3n_entre_ITIL_V3_e_ITIL_V2">espa&#xf1;ol</a></span></td>
</tr>
<tr>
<td>Author:</td>
<td><span itemprop="author">Andrea Kempter</span>, <span itemprop="creator copyrightHolder publisher">IT Process Maps</span> &nbsp;&nbsp; <a rel="author" href="https://www.linkedin.com/in/andreakempter"><img style="margin:0px 0px 0px 0px;" src="/images/bookmarking/linkedin.png" width="16" height="16" title="By: Andrea Kempter | Profile on LinkedIn" alt="Author: Andrea Kempter, IT Process Maps GbR" /></a></td>
</tr>
</table></html>


<p>&nbsp;</p>
<p>&nbsp;</p>

Latest revision as of 12:59, 30 March 2019

DE - ES - ITIL v3 vs. ITIL V2 - Comparison and Changesdiese Seite in Deutschesta página en español
DE - ES - ITIL v3 vs. ITIL V2 - Comparison and Changes

 

Comparison and Changes between ITIL V3 and ITIL V2 in General

Most importantly, a detailed comparison between ITIL V3 and V2 reveals that all the main processes known from ITIL V2 are still there, with only few substantial changes. In many instances, however, ITIL V3 offers revised and enhanced process descriptions.

 

New ITIL Structure: The ITIL V3 Service Lifecycle

The main difference between ITIL V3 and V2 is the new ITIL V3 Service Lifecycle structure: ITIL V3 is best understood as seeking to implement feedback-loops by arranging processes in a circular way.

This means the old structure of Service Support and Service Delivery was replaced by a new one consisting of the five ITIL V3 core disciplines:

  • Service Strategy determines which types of services should be offered to which customers or markets
  • Service Design identifies service requirements and devises new service offerings as well as changes and improvements to existing ones
  • Service Transition builds and deploys new or modified services
  • Service Operation carries out operational tasks
  • Continual Service Improvement learns from past successes and failures and continually improves the effectiveness and efficiency of services and processes.

ITIL V3 complements the processes known from ITIL V2 with a number of new processes and puts more emphasis on producing value for the business.

Modifications to Process Interfaces in ITIL V3

Due to the new Service Lifecycle structure, all interfaces between the ITIL processes were changed in order to reflect the new ITIL V3 process structure; so even if processes in ITIL V3 and V2 are broadly identical, their interfaces have changed. Example: The Incident Management process must now link to the Service Design processes, although a comparison between Incident Management in ITIL V2 and V3 reveals that the process itself did not change substantially.

 

Comparison and Changes between ITIL V3 and ITIL V2 in Detail

Service Strategy


Service Portfolio Management

  • Managing services as a portfolio is a new concept in ITIL V3
  • ITIL V3 takes this concept further, introducing strategic thinking about how the Service Portfolio should be developed in the future

Financial Management

  • Essentially, the activities and process objectives of the Financial Management process are identical in ITIL V2 and V3
  • Financial Management was part of Service Delivery in ITIL V2

 

Service Design


Service Catalogue Management

  • Service Catalogue Management was added as a new process in ITIL V3
  • In ITIL V2, the Service Level Management process mentioned the concept of a Service Catalogue
  • ITIL V3 takes this concept further, introducing a dedicated process to ensure that the Service Catalogue is up-to-date and contains reliable information
  • ITIL V3 introduces a clear distinction in the Service Catalogue between Business Services (services visible to the customer, defined by SLAs), Supporting Services (services visible only inside the IT organization, defined by OLAs or UCs)

Service Level Management

  • Essentially, the activities and process objectives of the Service Level Management process are identical in ITIL V2 and V3
  • In ITIL V3, the Service Review activities are part of Continual Service Improvement

Risk Management

  • Risks are addressed within several processes in ITIL V2 and ITIL V3; there is, however, no dedicated Risk Management process
  • ITIL V3 calls for “coordinated risk assessment exercises”, so at IT Process Maps we decided to assign clear responsibilities for managing risks, which meant introducing a specific Risk Management process as part of the ITIL® Process Map V3
  • Having a basic Risk Management process in place will provide a good starting point for introducing best-practice Risk Management frameworks like M_o_R (as recommended in the ITIL V3 books)

Capacity Management

  • No major differences between ITIL V2 and ITIL V3

Availability Management

  • No major differences between ITIL V2 and ITIL V3

IT Service Continuity Management

  • No major differences between ITIL V2 and ITIL V3

Information Security Management

  • ITIL V2 provided guidance on Security Management in a separate book
  • ITIL V3 treats Information Security Management as part of the Service Design core volume, resulting in a better integration of this process into the Service Lifecycle
  • The process was updated to account for new security concerns

Compliance Management

  • Compliance issues are addressed within several processes in ITIL V2 and ITIL V3; there is, however, no dedicated Compliance Management process
  • Compliance is an increasingly important topic for IT organizations, so at IT Process Maps we decided to assign clear responsibilities for ensuring compliance, which meant introducing a specific Compliance Management process as part of the ITIL® Process Map V3

Architecture Management

  • Architecture Management was covered within Application Management in ITIL V2
  • ITIL V3 provides guidance on IT architecture issues as part of a chapter on "technology-related activities"
  • Having a well-defined architecture blueprint in place is very important for IT organizations, so at IT Process Maps we decided to assign clear responsibilities for managing the enterprise architecture, which meant introducing a specific Architecture Management process as part of the ITIL® Process Map V3

Supplier Management

  • Supplier Management was covered within ICT Infrastructure Management in ITIL V2
  • In ITIL V3, Supplier Management is part of the Service Design process to allow for a better integration into the Service Lifecycle

 

Service Transition


Change Management

  • Essentially, the activities and process objectives of the Change Management process are identical in ITIL V2 and V3
  • ITIL V3 introduces "Change Models", putting more emphasis on defining different types of Changes and how they are to be handled
  • Emergency Changes in ITIL V3 are authorized by the Emergency Change Advisory Board (ECAB), which was known as the Emergency Committee (EC) in ITIL V2

Project Management (Transition Planning and Support)

  • Transition Planning and Support is a new process in ITIL V3; ITIL V2 covered some aspects of this process within Release Management but ITIL V3 provides considerably enhanced guidance
  • Transition Planning and Support in ITIL V3 is actually about managing service transition projects, so at IT Process Maps we decided to make this clear by slightly changing its name to "Project Management (Transition Planning and Support)"
  • ITIL V3 does not provide a detailed explanation of all aspects of Project Management but highlights the most important activities and assists in identifying interfaces with the other Service Management processes. However, having a basic Project Management process defined will provide a good starting point for introducing best-practice Project Management frameworks like PRINCE2 or PMBOK (as recommended in the ITIL V3 books)

Release and Deployment Management

  • Essentially, the activities and process objectives of the Release and Deployment Management process in ITIL V3 are identical to Release Management in ITIL V2
  • ITIL V3 provides considerably more details in the areas of Release planning and testing; this led to the addition of two dedicated processes in ITIL V3 which were subsumed under Release Management in the previous ITIL version:
    • Project Management (Transition Planning and Support)
    • Service Validation and Testing

Service Validation and Testing

  • Service Validation and Testing is new process in ITIL V3; ITIL V2 covered some aspects of Release testing within Release Management but ITIL V3 provides considerably enhanced guidance
  • Major additions in ITIL V3 are details on the various testing stages during Service Transition and descriptions of the corresponding testing approaches

Application Development and Customization

  • Application Development is barely mentioned in the ITIL V3 books, as ITIL V3 focuses on different topics like service design and rollout
  • At IT Process Maps we decided to eliminate that gap by introducing an Application Development process which takes care of the actual application coding and the customization of standard software packages
  • Even if Application Development is generally regarded a field of its own, we think an Application Management process must be included in any ITIL V3 process structure to make sure that there are clearly defined interfaces between the design, development and rollout stages of a service

Service Asset and Configuration Management

Knowledge Management

  • Knowledge Management was added as a new process in ITIL V3
  • Many aspects of Knowledge Management were covered by various processes in ITIL V2 - for example, Problem Management was (and in ITIL V3 still is) responsible for managing the Known Error Database
  • ITIL V3, however, defines Knowledge Management as the one central process responsible for providing knowledge to all other IT Service Management processes

 

Service Operation


Event Management

  • Event Management was part of ICT Infrastructure Management in ITIL V2
  • Activities and process objectives of the Event Management process are broadly identical in ITIL V2 and V3
  • ITIL V3 sees Event Management as an important trigger of the Incident and Problem Management processes

Incident Management

  • Essentially, the activities and process objectives of the Incident Management process are identical in ITIL V2 and V3
  • ITIL V3 distinguishes between Incidents (Service Interruptions) and Service Requests (standard requests from users, e.g. password resets)
  • Service Requests are no longer fulfilled by Incident Management; instead there is a new process called Request Fulfilment
  • There is a dedicated process now for dealing with emergencies ("Major Incidents")
  • A process interface was added between Event Management and Incident Management. Significant Events are now triggering the creation of an Incident

Request Fulfilment

  • Request Fulfilment was added as a new process to ITIL V3 with the aim to have a dedicated process dealing with Service Requests
  • This was motivated by a clear distinction in ITIL V3 between Incidents (Service Interruptions) and Service Requests (standard requests from users, e.g. password resets)
  • In ITIL V2, Service Requests were fulfilled by the Incident Management process

Access Management

  • Access Management was added as a new process to ITIL V3
  • The decision to include this dedicated process was motivated by IT security reasons, as granting access to IT services and applications only to authorized users is of high importance from an IT Security viewpoint

Problem Management

  • Essentially, the activities and process objectives of the Problem Management process are identical in ITIL V2 and ITIL V3
  • A new sub-process "Major Problem Review" was introduced to review the solution history of major Problems in order to prevent a recurrence and learn lessons for the future

IT Operations Management

  • IT Operations Management is part of ICT Infrastructure Management in ITIL V2
  • Some operational aspects were described in more detail in ITIL V2 as in the new ITIL V3 books

Facilities Management

  • Facilities Management is part of ICT Infrastructure Management in ITIL V2
  • Some aspects of managing facilities were described in more detail in ITIL V2 as in the new ITIL V3 books

 

Continual Service Improvement


  • ITIL V2 contained some Continual Service Improvement activities within the Service Level Management process, for example holding Service Reviews and managing a Service Improvement Plan
  • ITIL V3 expands this into a whole new book, introducing dedicated processes for service and process evaluation and improvement.

 

ITIL V3 2011 Edition

Note: The new edition of ITIL 4 was published in February 2019. In our YaSM Service Management Wiki we provide a detailed comparison between the latest edition of ITIL 4 and ITIL V3 2011.

 

[ Infobox ]

Link to this page:
Languages: English | Deutsch | español
Author: , IT Process Maps