ITIL Change Evaluation: Difference between revisions

From IT Process Wiki
(Created page with "<seo metakeywords="change evaluation itil, itil change evaluation" metadescription="Change Evaluation: ITIL process definition - Sub-processes - Terms - Additional information on...")
 
Line 9: Line 9:
<p>&nbsp;</p>
<p>&nbsp;</p>


''ITIL Change Evaluation'' aims to assess major Changes, like the introduction of a new service or a substantial change to an existing service, before those Changes are allowed to proceed to the next phase in their lifecycle.
==<span id="ITIL Change Evaluation">Overview</span>==
 
'''Objective''': ''ITIL Change Evaluation'' aims to assess major Changes, like the introduction of a new service or a substantial change to an existing service, before those Changes are allowed to proceed to the next phase in their lifecycle.


'''Part of''': [[ITIL V3 Service Transition|Service Transition]]
'''Part of''': [[ITIL V3 Service Transition|Service Transition]]
Line 17: Line 19:
<p>&nbsp;</p>
<p>&nbsp;</p>


== ITIL Change Evaluation ==
== Process Description ==


==== Process Description ====
In '''''ITIL 2011''''' a Change Evaluation process has been added, following a clarification in the ITIL&reg; books that the purpose of this process is the evaluation of Major Changes.
 
In ''ITIL 2011'' a Change Evaluation process has been added, following a clarification in the ITIL&reg; books that the purpose of this process is the evaluation of Major Changes.


[[Image:Itil-change-evaluation.jpg|right|thumb|370px|alt=Change Evaluation ITIL|[https://wiki.en.it-processmaps.com/images/pdf/process_overview_change_evaluation_itil.pdf ITIL Change Evaluation]]]
[[Image:Itil-change-evaluation.jpg|right|thumb|370px|alt=Change Evaluation ITIL|[https://wiki.en.it-processmaps.com/images/pdf/process_overview_change_evaluation_itil.pdf ITIL Change Evaluation]]]
Change Evaluation is called upon by the Change Management process at various points in a Change’s lifecycle to perform a Change assessment.
Change Evaluation is called upon by the Change Management process at various points in a Change’s lifecycle to perform a Change assessment.


<span id="Sub-Processes">''These are the [[ITIL Change Evaluation]] sub-processes:''</span>
The process overview of [[Media:Itil-change-evaluation.jpg|ITIL Change Evaluation]] is showing the most important interfaces (see Figure 1).


<p>&nbsp;</p>
<p>&nbsp;</p>


;<span id="">Change Evaluation prior to Planning</span>
== Sub-Processes ==
 
These are the [[ITIL Change Evaluation]] sub-processes and their process objectives:
 
<p>&nbsp;</p>
 
;<span id="Change Evaluation Planning">Change Evaluation prior to Planning</span>
:Process Objective: To assess a proposed major Change before authorizing the Change planning phase.
:Process Objective: To assess a proposed major Change before authorizing the Change planning phase.


;<span id="">Change Evaluation prior to Build</span>
;<span id="Change Evaluation Build">Change Evaluation prior to Build</span>
:Process Objective: To assess a proposed major Change before authorizing the Change build phase.
:Process Objective: To assess a proposed major Change before authorizing the Change build phase.


;<span id="">Change Evaluation prior to Deployment</span>
;<span id="Change Evaluation Deployment">Change Evaluation prior to Deployment</span>
:Process Objective: To assess a proposed major Change before authorizing the Change deployment phase.
:Process Objective: To assess a proposed major Change before authorizing the Change deployment phase.


;<span id="">Change Evaluation after Deployment</span>
;<span id="Change Evaluation after Deployment">Change Evaluation after Deployment</span>
:Process Objective: To assess a major Change after it has been implemented, to verify if the Change has met its objectives and to identify any lessons to be learned.
:Process Objective: To assess a major Change after it has been implemented, to verify if the Change has met its objectives and to identify any lessons to be learned.


<p>&nbsp;</p>
<p>&nbsp;</p>


==== Downloads ====
== Definitions ==
 
Use the following links to open the process overview of Change Evaluation showing the most important interfaces:


* [[Media:Itil-change-evaluation.jpg|ITIL Change Evaluation (.JPG)]]
The following ITIL terms and acronyms (''information objects'') are used in ITIL Change Evaluation to represent process outputs and inputs:
* [https://wiki.en.it-processmaps.com/images/pdf/process_overview_change_evaluation_itil.pdf ITIL Change Evaluation (.PDF)]


<p>&nbsp;</p>
<p>&nbsp;</p>
==== ITIL Terms ====


;<span id="Change Evaluation Report">Change Evaluation Report</span>
;<span id="Change Evaluation Report">Change Evaluation Report</span>
Line 60: Line 61:
<p>&nbsp;</p>
<p>&nbsp;</p>


==== ITIL Roles ====
== Roles | Responsibilities ==


;<span id="Change Manager">Change Manager - Process Owner</span>
;<span id="Change Manager">Change Manager - Process Owner</span>
Line 68: Line 69:
<p>&nbsp;</p>
<p>&nbsp;</p>


{| border="1" cellpadding="5" cellspacing="0" style="text-align:center;" valign="top"
{| border="1" align="center" cellpadding="5" cellspacing="0" style="text-align:center;" valign="top"
|-
|-
| valign="top" colspan="3" style="background:#ffffdd;" align="center"| '''Responsibility Matrix: ITIL Change Evaluation'''
| valign="top" colspan="3" style="background:#ffffdd;" align="center"| '''Responsibility Matrix: ITIL Change Evaluation'''
|-
|-
!  width="50%" align="center" style="background:#ffffee;" | ITIL Role | Sub-Process
!  width="50%" align="center" style="background:#ffffee;" | ITIL Role | Sub-Process
! style="background:#ffffee;" | [[ITIL Change Evaluation#Change Manager|Change Manager]]
! style="background:#ffffee;" | [[ITIL Change Evaluation#Change Manager|Change Manager]]
! style="background:#ffffee;" | Andere beteiligte Rollen
! style="background:#ffffee;" | Other roles involved
|-
|-
| align="left" |[[#ITIL Change-Evaluierung Planung|Change-Evaluierung vor Planungs-Start]]
| align="left" |[[#Change Evaluation Planning|Change Evaluation prior to Planning]]
| A[[ITIL Change Evaluation#Accountable|<small>[1]</small>]]R[[ITIL Change Evaluation#Responsible|<small>[2]</small>]]
| A[[ITIL Change Evaluation#Accountable|<small>[1]</small>]]
| R[[ITIL Change Evaluation#Team|<small>[3]</small>]]
| R[[ITIL Change Evaluation#Responsible|<small>[2]</small>]][[ITIL Change Evaluation#Team|<small>[3]</small>]]
|-
|-
| align="left" |[[#Change-Evaluierung Build|Change-Evaluierung vor Build-Start]]
| align="left" |[[#Change Evaluation Build|Change Evaluation prior to Build]]
| A
| A
| R[[ITIL Change Evaluation#Team|<small>[3]</small>]]
| R[[ITIL Change Evaluation#Team|<small>[3]</small>]]
|-
|-
| align="left" |[[#ITIL Change-Evaluierung Deployment|Change-Evaluierung vor Deployment-Start]]
| align="left" |[[#Change Evaluation Deployment|Change Evaluation prior to Deployment]]
| A
| A
| R[[ITIL Change Evaluation#Team|<small>[3]</small>]]
| R[[ITIL Change Evaluation#Team|<small>[3]</small>]]
|-
|-
| align="left" |[[#Change-Evaluierung nach Deployment|Change-Evaluierung nach Deployment]]
| align="left" |[[#Change Evaluation after Deployment|Change Evaluation after Deployment]]
| A
| A
| R[[ITIL Change Evaluation#Team|<small>[3]</small>]]
| R[[ITIL Change Evaluation#Team|<small>[3]</small>]]
Line 96: Line 97:
<p>&nbsp;</p>
<p>&nbsp;</p>


'''Erläuterungen'''
'''Remarks'''


<span id="Accountable">[1] ''A: Accountable'' according to the RACI Model: Those who are ultimately accountable for the correct and thorough completion of the Change Evaluation process.</span>
<span id="Accountable">[1] ''A: Accountable'' according to the RACI Model: Those who are ultimately accountable for the correct and thorough completion of the Change Evaluation process.</span>

Revision as of 19:18, 28 October 2011

<seo metakeywords="change evaluation itil, itil change evaluation" metadescription="Change Evaluation: ITIL process definition - Sub-processes - Terms - Additional information on ITIL Change Evaluation." />

Change Evaluation
Change Evaluation


 

Overview

Objective: ITIL Change Evaluation aims to assess major Changes, like the introduction of a new service or a substantial change to an existing service, before those Changes are allowed to proceed to the next phase in their lifecycle.

Part of: Service Transition

Process Owner: Change Manager

 

Process Description

In ITIL 2011 a Change Evaluation process has been added, following a clarification in the ITIL® books that the purpose of this process is the evaluation of Major Changes.

Change Evaluation ITIL
ITIL Change Evaluation

Change Evaluation is called upon by the Change Management process at various points in a Change’s lifecycle to perform a Change assessment.

The process overview of ITIL Change Evaluation is showing the most important interfaces (see Figure 1).

 

Sub-Processes

These are the ITIL Change Evaluation sub-processes and their process objectives:

 

Change Evaluation prior to Planning
Process Objective: To assess a proposed major Change before authorizing the Change planning phase.
Change Evaluation prior to Build
Process Objective: To assess a proposed major Change before authorizing the Change build phase.
Change Evaluation prior to Deployment
Process Objective: To assess a proposed major Change before authorizing the Change deployment phase.
Change Evaluation after Deployment
Process Objective: To assess a major Change after it has been implemented, to verify if the Change has met its objectives and to identify any lessons to be learned.

 

Definitions

The following ITIL terms and acronyms (information objects) are used in ITIL Change Evaluation to represent process outputs and inputs:

 

Change Evaluation Report
Certain types of major Changes, like the introduction of a new service or a substantial change to an existing service, require formal Change evaluations before being authorized. The results of a formal Change evaluation are documented in a Change Evaluation Report. Change evaluations may be used at different points in a Change’s lifecycle, for example before authorizing the Change/Release build or during the Post Implementation Review.

 

Roles | Responsibilities

Change Manager - Process Owner
The Change Manager authorizes and documents all changes in the IT Infrastructure and its components (Configuration Items), in order to maintain a minimum amount of interruptive effects upon the running operation.
In the case of further-reaching changes, he involves the Change Advisory Board (CAB).

 

Responsibility Matrix: ITIL Change Evaluation
ITIL Role | Sub-Process Change Manager Other roles involved
Change Evaluation prior to Planning A[1] R[2][3]
Change Evaluation prior to Build A R[3]
Change Evaluation prior to Deployment A R[3]
Change Evaluation after Deployment A R[3]

 

Remarks

[1] A: Accountable according to the RACI Model: Those who are ultimately accountable for the correct and thorough completion of the Change Evaluation process.

[2] R: Responsible according to the RACI Model: Those who do the work to achieve a task within Change Evaluation.

[3] In cooperation, as appropriate: Applications Analyst, Technical Analyst, Configuration Manager, Project Manager, Risk Manager and others. Role descriptions...