Risk Management: Difference between revisions

From IT Process Wiki
No edit summary
 
No edit summary
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
{|
<itpmch><title>Risk Management | IT Process Wiki</title>
! align="right" width="80%"|
<meta name="keywords" content="itil risk management, risk management itil, itil risk management process, risk management process" />
! style="background:#DDDDDD;" align="right" width="20%"| [https://wiki.de.it-processmaps.com/index.php/Risikomanagement diese Seite auf Deutsch]
<meta name="description" content="The objective of ITIL Risk Management is to identify, assess and control risks. This includes analyzing the value of assets to the business, identifying threats to those assets, and evaluating how vulnerable each asset is to those threats." />
|}
<meta property="og:url" content="https://wiki.en.it-processmaps.com/index.php/Risk_Management" />
<meta property="og:title" content="Risk Management | IT Process Wiki" />
<meta property="og:description" content="The objective of ITIL Risk Management is to identify, assess and control risks. This includes analyzing the value of assets to the business, identifying threats to those assets, and evaluating how vulnerable each asset is to those threats." />
<meta property="og:site_name" content="IT Process Wiki - the ITIL&#174; Wiki">
<meta property="og:type" content="article" />
<meta property="article:publisher" content="https://www.facebook.com/itprocessmaps" />
<meta property="fb:admins" content="100002035253209" />
<meta property="fb:admins" content="100002592864414" />
<meta property="og:image" content="https://wiki.en.it-processmaps.com/images/b/ba/Itil-risk-management.jpg" />
<meta property="og:image:width" content="1200" />
<meta property="og:image:height" content="1200" />
<link href="https://plus.google.com/108613479011811316823/posts" rel="publisher" />
</itpmch>
<imagemap>
Image:ITIL-Wiki-de-es.jpg|right|DE - ES - Risk Management|163px
rect 81 0 114 36 [https://wiki.de.it-processmaps.com/index.php/Risikomanagement diese Seite auf Deutsch]
rect 115 0 163 36 [https://wiki.es.it-processmaps.com/index.php/ITIL_Gestion_del_Riesgo esta página en español]
desc none
</imagemap>
<br style="clear:both;"/>
 
'''<span id="Overview">Objective:</span>''' <html><span id="md-webpage-description" itemprop="description">The objective of <i>ITIL Risk Management</i> is to identify, assess and control risks. This includes analyzing the value of assets to the business, identifying threats to those assets, and evaluating how vulnerable each asset is to those threats.</span></p>
<p><b>Part of</b>: <a href="https://wiki.en.it-processmaps.com/index.php/ITIL_Service_Design" title="ITIL Service Design">Service Design</a></html>
 
'''Process Owner''': [[Risk Management#Risk Manager|Risk Manager]]
 
<p>&nbsp;</p>
 
==Process Description==
 
[[Image:Itil-risk-management.jpg|right|thumb|500px|alt=Risk Management ITIL|link=https://wiki.en.it-processmaps.com/index.php/File:Itil-risk-management.jpg|[https://wiki.en.it-processmaps.com/images/pdf/process_overview_risk_management_itilv3.pdf ITIL Risk Management]]]
 
Risk management is not on the list of official ITIL 2011 processes, but concepts for dealing with risks are described in several ITIL processes, and ITIL calls for "coordinated risk assessment exercises". So there are good reasons for organizations to define and implement a risk management process, and at IT Process Maps we decided to introduce a specific Risk Management process as part of the [https://en.it-processmaps.com/products/itil-process-map.html ITIL&reg; Process Map].
 
Having a basic Risk Management process in place will provide a good starting point for introducing best-practice Risk Management frameworks like M_o_R (as recommended in the ITIL V3 books).
 
Following the introduction of [[ITIL Design Coordination|Design Coordination]] in ITIL 2011 the information flows have been adapted slightly. The process overview of [[Media:Itil-risk-management.jpg|ITIL Risk Management (.JPG)]] shows the key information flows (see fig. 1).
 
[[ITIL 4]] refers to 'Risk Management' as a [[ITIL_4#General_management_practices|general management practice]].
<p style="clear:both;">&nbsp;</p>
 
==Sub-Processes==
 
<html><div itemscope="itemscope" itemtype="https://schema.org/ItemList"><!-- define schema.org/ItemList -->
<meta itemprop="itemListOrder" content="Ascending" />
<p><span itemprop="name" content="Risk Management sub-processes:">These are the <strong class="selflink">ITIL Risk Management</strong> sub-processes and their process objectives:</span>
</p>
<p><b><span id="ITIL_Risk_Management_Support" itemprop="itemListElement">Risk Management Support</span></b>
</p>
<ul><li itemprop="description">Process Objective: To define a framework for Risk Management. Most importantly, this process specifies how risk is quantified, what risks the organization is willing to accept, and who is in charge of the various Risk Management duties.
</li></ul>
<p><b><span id="ITIL_Risk_Analysis" itemprop="itemListElement">Business Impact and Risk Analysis</span></b>
</p>
<ul><li itemprop="description">Process Objective: To quantify the impact to the business that a loss of service or asset would have, and to determine the likelihood of a threat or vulnerability to actually occur. The result of the "<a href="/index.php/Risk_Management#Business_Impact_and_Risk_Analysis" title="Risk Management">Business Impact and Risk Analysis</a>" is the <a href="/index.php/Risk_Management#Risk_Register" title="Risk Management">Risk Register</a>, a prioritized list of risks which must be subsequently addressed.
</li></ul>
<p><b><span id="ITIL_Risk_Management_Assessment" itemprop="itemListElement">Assessment of Required Risk Mitigation</span></b>
</p>
<ul><li itemprop="description">Process Objective: To determine where risk mitigation measures are required, and to identify Risk Owners who will be responsible for their implementation and ongoing maintenance.
</li></ul>
<p><b><span id="Risk_Monitoring_ITIL" itemprop="itemListElement">Risk Monitoring</span></b>
</p>
<ul><li itemprop="description">Process Objective: To monitor the progress of counter measure implementation, and to take corrective action where necessary.
</li></ul>
</div><!-- end of schema.org/ItemList --><p></html>


'''ITIL Version''': ITIL Version 3 (ITIL V3)
==Definitions==


'''Process Objective''': To identify, assess and control risks. This includes analysing the value of assets to the business, identifying threats to those assets, and evaluating how vulnerable each asset is to those threats.
<html><div itemscope="itemscope" itemtype="https://schema.org/ItemList"><!-- define schema.org/ItemList -->
<meta itemprop="itemListOrder" content="Ascending" />
<p><span itemprop="name">The following <a href="/index.php/ITIL_Glossary#ITIL_Glossary_A-Z" title="ITIL Glossary">ITIL terms and acronyms</a> (<i>information objects</i>) are used in the ITIL Risk Management process to represent process outputs and inputs:</span>
</p>
<p><b><span id="Business_Impact_and_Risk_Analysis" itemprop="itemListElement">Business Impact and Risk Analysis</span></b>
</p>
<ul><li itemprop="description">Business Impact Analysis (BIA) and Risk Analysis are concepts associated with Risk Management. Their ultimate goal is to identify which risks must be managed and addressed by risk mitigation measures.
</li></ul>
<p><b><span id="Process_and_Asset_Valuation" itemprop="itemListElement">Process and Asset Valuation</span></b>
</p>
<ul><li itemprop="description">An estimate of the value a process or other asset represents for the business. This value is an important input for <a href="/index.php/Risk_Management#Business_Impact_and_Risk_Analysis" title="Risk Management">Risk Analysis</a>.
</li></ul>
<p><b><span id="Risk_Management_Policy" itemprop="itemListElement">Risk Management Policy</span></b>
</p>
<ul><li itemprop="description">The Risk Management Policy describes and communicates the organization’s approach to managing risk. Most importantly, it defines how risk is quantified and who is in charge of specific risk management duties. The Risk Management Policy is maintained by the <a href="/index.php/Risk_Management#Risk_Manager" title="Risk Management">Risk Manager</a> role, but to be effective it needs the backing of senior management.
</li></ul>
<p><b><span id="Risk_Register" itemprop="itemListElement">Risk Register</span></b>
</p>
<ul><li itemprop="description">The Risk Register is a tool used by the Risk Management process to keep an overview of identified risks and corresponding counter measures. The Risk Register is sometimes referred to as the <i>Risk Log</i>.
</li></ul>
</div><!-- end of schema.org/ItemList --><p></html>


'''Part of''': [[ITIL V3 Service Design|Service Design]]
==Roles | Responsibilities==


'''Process Owner''': [[Roles within ITIL V3#Risk Manager|Risk Manager]]
'''<span id="Risk Manager">Risk Manager - Process Owner</span>'''
*The Risk Manager is responsible for identifying, assessing and controlling risks. This includes analyzing the value of assets to the business, identifying threats to those assets, and evaluating how vulnerable each asset is to those threats.


<p>&nbsp;</p>


==ITIL V3 vs. ITIL V2: Risk Management ==
{| class="wikitable" style="background: white;"
|-
|+ style="background:#013b5e; color:#ffffff; font-size: 120%" colspan="5"|'''<span id="RACI-Matrix-Risk-Management">Verantwortlichkeits-Matrix: ITIL Risk Management</span>'''
|-
!style="background:#ffffee; width: 50%; text-align:center" | ITIL Role / Sub-Process
! style="background:#eeeeee;" | [[Risk Management#Risk Manager|Risk Manager]]
! style="background:#eeeeee;" | Other roles involved
|-
|style="text-align:left;" |[[#ITIL Risk Management Support|Risk Management Support]]
| A[[Risk Management#Accountable|<small>[1]</small>]]R[[Risk Management#Responsible|<small>[2]</small>]]
| -
|-
|style="text-align:left;" |[[#ITIL Risk Analysis|Business Impact and Risk Analysis]]
| AR
| R[[#ITIL Risk Management Group|<small>[3]</small>]]
|-
|style="text-align:left;" |[[#ITIL Risk Management Assessment|Assessment of Required Risk Mitigation]]
| AR
| -
|-
|style="text-align:left;" |[[#Risk Monitoring ITIL|Risk Monitoring]]
| AR
| -
|-
|}


* Risks are addressed within several processes in ITIL V2 and ITIL V3; there is, however, no dedicated Risk Management process
'''Remarks'''
* ITIL V3 calls for “coordinated risk assessment exercises”, so at IT Process Maps we decided to assign clear responsibilities for managing risks, which meant introducing a specific Risk Management process as part of the ITIL&reg; Process Map V3
* Having a basic Risk Management process in place will provide a good starting point for introducing best-practice Risk Management frameworks like M_o_R (as recommended in the ITIL V3 books)


<span id="Accountable">[1] ''A: Accountable'' according to the RACI Model: Those who are ultimately accountable for the correct and thorough completion of the ITIL Risk Management process.</span>


==Sub-Processes of Risk Management (ITIL V3)==
<span id="Responsible">[2] ''R: Responsible'' according to the RACI Model: Those who do the work to achieve a task within Risk Management.</span>


[[Image:overview_risk_management_itilv3_thumb.jpg|frame|left|[https://wiki.en.it-processmaps.com/images/pdf/process_overview_risk_management_itilv3.pdf  Overview of the Risk Management Process, ITIL V3 (.pdf)]]]
<span id="ITIL Risk Management Group">[3] Availability Manager, IT Service Continuity Manager, Information Security Manager, Compliance Manager, and Supplier Manager (see [[ITIL Roles|&#8594; Role descriptions]])</span>


;Business Impact and Risk Analysis
==Notes==
:Process Objective: To quantify the impact to the business that a loss of service or asset would have, and to determine the likelihood of a threat or vulnerability to actually occur. The result of this process is the Risk Register, a prioritized list of risks which must be subsequently addressed.


;Assessment of Required Risk Mitigation
<html>By:&#160;&#160;Stefan Kempter&#160;<a rel="author" href="https://www.linkedin.com/in/stefankempter"><img style="margin:0px 0px 0px 0px;" src="/images/bookmarking/linkedin.png" width="16" height="16" title="By: Stefan Kempter | Profile on LinkedIn" alt="Author: Stefan Kempter, IT Process Maps GbR" /></a>, IT Process Maps.</p>
: Process Objective: To determine where risk mitigation measures are required, and to identify Risk Owners who will be responsible for their implementation and ongoing maintenance.


;Risk Monitoring
<p>&nbsp;</p>
:Process Objective: To monitor the progress of counter measure implementation, and to take corrective action where necessary.


<br style="clear:both;"/>
<p><small>
<span itemprop="breadcrumb" itemscope itemtype="http://schema.org/BreadcrumbList">
<span itemprop="itemListElement" itemscope itemtype="http://schema.org/ListItem">
<a itemprop="item" href="https://wiki.en.it-processmaps.com/index.php/Risk_Management#Process_Description">
<span itemprop="name">Process Description</span></a>
<meta itemprop="position" content="1"></span> ›
<span itemprop="itemListElement" itemscope itemtype="http://schema.org/ListItem">
<a itemprop="item" href="https://wiki.en.it-processmaps.com/index.php/Risk_Management#Sub-Processes">
<span itemprop="name">Sub-Processes</span></a>
<meta itemprop="position" content="2"></span> ›
<span itemprop="itemListElement" itemscope itemtype="http://schema.org/ListItem">
<a itemprop="item" href="https://wiki.en.it-processmaps.com/index.php/Risk_Management#Definitions">
<span itemprop="name">Definitions</span></a>
<meta itemprop="position" content="3"></span> ›
<span itemprop="itemListElement" itemscope itemtype="http://schema.org/ListItem">
<a itemprop="item" href="https://wiki.en.it-processmaps.com/index.php/Risk_Management#Roles_.7C_Responsibilities">
<span itemprop="name">Roles</span></a>
<meta itemprop="position" content="4" /></span>
</span>
</small></p>


==Roles within Risk Management (ITIL V3)==
<!-- define schema.org/WebPage --> <span itemscope itemtype="https://schema.org/WebPage" itemref="md-webpage-description">
  <meta itemprop="alternativeHeadline" content="ITIL Risk Management" />
  <meta itemprop="name" content="Risk Management" />
  <link itemprop="url" href="https://wiki.en.it-processmaps.com/index.php/Risk_Management" />
  <meta itemprop="inLanguage" content="en" />
  <link itemprop="citation" href="https://wiki.de.it-processmaps.com/index.php/Risikomanagement" />
  <link itemprop="citation" href="https://wiki.es.it-processmaps.com/index.php/ITIL_Gestion_del_Riesgo" />
  <meta itemprop="Headline" content="Risk Management" />
  <link itemprop="isPartOf" href="https://wiki.en.it-processmaps.com/index.php/ITIL_Service_Design" />
  <link itemprop="primaryImageOfPage" href="https://wiki.en.it-processmaps.com/images/b/ba/Itil-risk-management.jpg" />
  <span id="https://wiki.en.it-processmaps.com/images/b/ba/Itil-risk-management.jpg" itemprop="image" itemscope itemtype="https://schema.org/ImageObject">
  <meta itemprop="caption" content="Risk Management">
  <meta itemprop="contentUrl" content="https://wiki.en.it-processmaps.com/images/b/ba/Itil-risk-management.jpg" />
  <meta itemprop="width" content="1200" />
  <meta itemprop="height" content="1200" />
  <meta itemprop="representativeOfPage" content="true"/>
  <meta itemprop="dateCreated" content="2011-09-19" />
  <meta itemprop="dateModified" content="2020-06-20" />
  <span itemprop="thumbnail" itemscope itemtype="https://schema.org/ImageObject">
    <meta itemprop="url" content="https://wiki.en.it-processmaps.com/images/thumb/b/ba/Itil-risk-management.jpg/600px-Itil-risk-management.jpg" />
    <meta itemprop="width" content="600" />
    <meta itemprop="height" content="600" />
  </span>
  <meta itemprop="keywords" content="Risk Management" />
  <meta itemprop="keywords" content="ITIL Risk Management" />
  </span>
  <link itemprop="author" href="https://www.linkedin.com/in/stefankempter" />
  <meta itemprop="author" content="Stefan Kempter" />
  <meta itemprop="creator copyrightHolder publisher" content="IT Process Maps" />
</span><p></html>


* [[Roles within ITIL V3#Risk Manager|Risk Manager]] (Process Owner)
<!-- This page is assigned to the following categories: -->
[[Category:ITIL 4]][[Category:ITIL 2011]][[Category:ITIL V3]][[Category:ITIL practice]][[Category:ITIL process]][[Category:Service Design|Risk Management]][[Category:Risk Management|!]]
<!-- --- -->

Latest revision as of 11:52, 31 December 2023

DE - ES - Risk Managementdiese Seite auf Deutschesta página en español
DE - ES - Risk Management


Objective: The objective of ITIL Risk Management is to identify, assess and control risks. This includes analyzing the value of assets to the business, identifying threats to those assets, and evaluating how vulnerable each asset is to those threats.

Part of: Service Design

Process Owner: Risk Manager

 

Process Description

Risk Management ITIL
ITIL Risk Management

Risk management is not on the list of official ITIL 2011 processes, but concepts for dealing with risks are described in several ITIL processes, and ITIL calls for "coordinated risk assessment exercises". So there are good reasons for organizations to define and implement a risk management process, and at IT Process Maps we decided to introduce a specific Risk Management process as part of the ITIL® Process Map.

Having a basic Risk Management process in place will provide a good starting point for introducing best-practice Risk Management frameworks like M_o_R (as recommended in the ITIL V3 books).

Following the introduction of Design Coordination in ITIL 2011 the information flows have been adapted slightly. The process overview of ITIL Risk Management (.JPG) shows the key information flows (see fig. 1).

ITIL 4 refers to 'Risk Management' as a general management practice.

 

Sub-Processes

These are the ITIL Risk Management sub-processes and their process objectives:

Risk Management Support

  • Process Objective: To define a framework for Risk Management. Most importantly, this process specifies how risk is quantified, what risks the organization is willing to accept, and who is in charge of the various Risk Management duties.

Business Impact and Risk Analysis

  • Process Objective: To quantify the impact to the business that a loss of service or asset would have, and to determine the likelihood of a threat or vulnerability to actually occur. The result of the "Business Impact and Risk Analysis" is the Risk Register, a prioritized list of risks which must be subsequently addressed.

Assessment of Required Risk Mitigation

  • Process Objective: To determine where risk mitigation measures are required, and to identify Risk Owners who will be responsible for their implementation and ongoing maintenance.

Risk Monitoring

  • Process Objective: To monitor the progress of counter measure implementation, and to take corrective action where necessary.

Definitions

The following ITIL terms and acronyms (information objects) are used in the ITIL Risk Management process to represent process outputs and inputs:

Business Impact and Risk Analysis

  • Business Impact Analysis (BIA) and Risk Analysis are concepts associated with Risk Management. Their ultimate goal is to identify which risks must be managed and addressed by risk mitigation measures.

Process and Asset Valuation

  • An estimate of the value a process or other asset represents for the business. This value is an important input for Risk Analysis.

Risk Management Policy

  • The Risk Management Policy describes and communicates the organization’s approach to managing risk. Most importantly, it defines how risk is quantified and who is in charge of specific risk management duties. The Risk Management Policy is maintained by the Risk Manager role, but to be effective it needs the backing of senior management.

Risk Register

  • The Risk Register is a tool used by the Risk Management process to keep an overview of identified risks and corresponding counter measures. The Risk Register is sometimes referred to as the Risk Log.

Roles | Responsibilities

Risk Manager - Process Owner

  • The Risk Manager is responsible for identifying, assessing and controlling risks. This includes analyzing the value of assets to the business, identifying threats to those assets, and evaluating how vulnerable each asset is to those threats.

 

Verantwortlichkeits-Matrix: ITIL Risk Management
ITIL Role / Sub-Process Risk Manager Other roles involved
Risk Management Support A[1]R[2] -
Business Impact and Risk Analysis AR R[3]
Assessment of Required Risk Mitigation AR -
Risk Monitoring AR -

Remarks

[1] A: Accountable according to the RACI Model: Those who are ultimately accountable for the correct and thorough completion of the ITIL Risk Management process.

[2] R: Responsible according to the RACI Model: Those who do the work to achieve a task within Risk Management.

[3] Availability Manager, IT Service Continuity Manager, Information Security Manager, Compliance Manager, and Supplier Manager (see → Role descriptions)

Notes

By:  Stefan Kempter , IT Process Maps.

 

Process Description  › Sub-Processes  › Definitions  › Roles